ADUs

ADU construction,
start to finish

Garage conversions, attached and detached ADUs across San Francisco. Foundation, framing, plumbing, electrical, mechanical and finishes — coordinated through one contractor.

Where to start

An ADU is a small house, not a big room

An accessory dwelling unit has its own kitchen, its own bathroom, its own entry and its own utilities. That means foundation, framing, plumbing, electrical, mechanical, insulation, drywall and finishes — the full sequence of building a house, compressed into a smaller footprint on a site that already has a building on it.

That last part is what makes ADUs harder than their size suggests. There is an existing house to work around, neighbours on both sides, limited access for materials and machinery, and utility runs that have to reach a new structure from a supply that was sized for one dwelling.

Approach

Two routes, different problems

Garage conversion

The structure, slab and roof already exist, which removes a large part of the cost. What replaces it is floor build-up, insulation, egress, ventilation, a full MEP fit-out and often structural work where the garage was carrying the house above.

Attached ADU

Built off the existing house, sharing a wall and sometimes a foundation. Cheaper utility runs, but the connection to the existing structure has to be engineered and the existing building envelope has to be opened and made good.

Detached ADU

A separate structure in the rear yard. Fewest constraints from the existing house, but everything is new — footings, framing, roof, envelope — and the utility runs are longer.

Process

Design to build, in order

An ADU runs in a fixed sequence and skipping ahead costs money. Design and engineering come first, then permits, then site preparation and foundation, then framing, then the rough-in of plumbing, electrical and mechanical, then inspection, then insulation and drywall, then finishes, then final inspection.

Leafair takes on the construction from site preparation onward and coordinates the trades through that sequence. Design and structural engineering are handled by architects and engineers Leafair works with — you are told clearly which parts of the job sit with which party before anything is signed.

Cost drivers

What actually moves the number

Site access

Whether a machine can reach the rear yard, or whether every yard of concrete and every stick of lumber is carried through the house by hand. This is one of the largest single variables on an SF lot.

Excavation and foundation

Slope, soil and the depth required. A flat site with good soil and a shallow footing is a different job from a hillside needing retaining or piers.

Utility runs

How far water, sewer, gas and electrical have to travel to reach the new structure, and whether the existing service has capacity or needs upgrading.

Structural requirements

Anything that touches the existing house — a shared wall, a garage that carries floors above — needs engineering and adds both cost and time.

Finish level

A functional rental unit and a high-specification guest house use the same framing and very different kitchens, bathrooms, flooring and millwork.

Existing conditions

What is found once things are opened. Older SF housing stock regularly hides deferred maintenance, undersized framing and dated electrical.

Complications

What tends to come up on San Francisco lots

Narrow lots with no side access. Neighbouring structures within inches of the property line. Sloping rear yards. Sewer laterals that need replacing once they are exposed. Electrical services with no spare capacity. Foundations that were never designed to carry anything else.

None of these is unusual and all of them are manageable, but each one is a cost and a schedule item that should be identified before you commit, not discovered halfway through.

Guides

Read more before you commit

How to build an ADU in San Francisco walks the full process step by step. What drives ADU cost in San Francisco explains where the money goes. The San Francisco ADU permit process covers what happens between design and breaking ground.

Related Leafair services: foundations and structural work, home additions, and whole-home remodeling.

Questions

ADU construction, answered

Can I build an ADU on my property in San Francisco?

Most San Francisco lots with an existing home can accommodate an ADU in some form, but what is possible depends on the lot, the existing structure, access and utilities. The only reliable way to know is a site visit and a check against current planning and building requirements before any design work begins.

How long does an ADU take to build?

Design and engineering typically run for a period of months before construction starts, and the permit review adds time on top of that. Construction itself depends on whether the ADU is a garage conversion or new detached structure, on foundation work and on utility runs. Leafair gives you a schedule with the estimate rather than after work begins.

Is a garage conversion cheaper than a detached ADU?

Usually, because the structure, slab and roof already exist. But garage conversions bring their own costs: raising floor levels, adding insulation and egress, upgrading electrical, and often structural work where the garage was carrying the house above. A detached build starts from nothing but has fewer unknowns.

Do I need an architect and an engineer?

An ADU needs permit drawings, and structural elements need engineering. Leafair is a licensed general contractor, not a design firm or an engineer, and will refer you to architects and engineers it works with regularly rather than pretending to cover those roles.

Request a project consultation

Leafair will walk the site, talk through what is realistic, and give you a written estimate priced line by line. Estimates are free.