Whole-home

Full gut remodels,
one contractor

Structure, plumbing, electrical, HVAC, insulation, drywall, millwork, flooring and paint — sequenced through one schedule and priced line by line.

Scope

Back to the framing, then forward again

A whole-home remodel is a sequence problem more than a construction problem. Every trade depends on the one before it, inspections sit at fixed points, and a delay in the middle pushes everything behind it.

Leafair runs full gut remodels across San Francisco: demolition, structural changes, plumbing, electrical, mechanical, insulation, drywall, millwork, flooring, tile and paint, coordinated through one contractor with one schedule.

Trades

What a full gut covers

Demolition and structure

Interior taken back to framing, then structural changes — removing walls, carrying loads across new openings, correcting what previous work left behind.

Plumbing and electrical

Supply, waste and venting replaced; the electrical brought up to a service and layout that suits how the house is actually used.

HVAC and insulation

Heating and ventilation designed for the new layout, then insulation before anything is closed up.

Kitchens and bathrooms

The two rooms that set the tone. See kitchen remodeling and bathroom remodeling for how each is run.

Drywall, millwork, flooring

Drywall hung and finished, trim and built-ins made and fitted, flooring laid — the stage where the quality of the framing underneath becomes visible.

Paint and finish

Final finishes, fixtures and the punch list, worked through with you room by room rather than declared finished.

Proof

Two completed whole-home projects

Funston Street combined foundation work, structural framing, a full kitchen, a wet bar, glass partitions and stair work in one project. Dundee ran further still — exterior siding and weatherproofing, a kitchen with an island, a vaulted bedroom ceiling, a wet-pour bathroom floor, a cedar sauna and a workshop build.

Both are worth looking at for the process photographs, not only the finished rooms.

Control

Keeping a long job honest

Every trade priced as its own line so you can see what you are paying for. Changes written up, priced and agreed when they arise. Inspection holds respected rather than worked through. A schedule issued with the estimate and updated as the job runs.

On a job of this length, the discipline around change orders matters more than the initial number.

Questions

Whole-home remodeling, answered

What is the difference between a remodel and a full gut?

A remodel changes finishes and some layout. A full gut takes the interior back to framing so that plumbing, electrical, mechanical, insulation and structure can all be replaced. Once you are opening most of the walls, a gut is often the more economical route.

Can I live in the house during a whole-home remodel?

Rarely, on a genuine full gut. With no working kitchen, bathrooms out and power down in sections, most households move out. Phased remodels where one floor is completed before the next begins are possible and take longer overall.

How is the budget controlled?

By pricing every trade as its own line rather than as a lump, and by writing up changes as they arise instead of at the end. If work is added on site, it is priced and agreed before it is built.

How long does a whole-home remodel take?

Months, and the honest answer depends on structural scope, permit review and how many trades have to be sequenced. You get a schedule with the estimate.

Request a project consultation

Leafair will walk the site, talk through what is realistic, and give you a written estimate priced line by line. Estimates are free.