San Francisco · Kitchen Remodeling

Kitchens built around how you cook.

Full kitchen renovations across San Francisco — layout, cabinetry, stone, appliances, plumbing and electrical. Priced line by line, built by the person who quoted it.

#1108517CA licensed & insured
Line-itemEstimates, not lump sums
San Francisco kitchen remodel with black shaker cabinetry, a waterfall quartz island, book-matched slab backsplash, pot filler and wide-plank white oak flooring, built by Leafair Construction
Why kitchens are different

Cabinetry is unforgiving, and old SF houses are never square

A kitchen is the most trade-dense room in a house. Plumbing, electrical, gas, ventilation, cabinetry, stone and appliances all have to land in the same few square feet, in the right order, at tolerances measured in sixteenths. Cabinets show every bit of a wall that isn't plumb.

In San Francisco that's the normal condition, not the exception. Victorians and Edwardians settle, floors slope, and walls wander. Getting a level run of cabinetry and a stone top with tight seams out of a hundred-year-old house is carpentry, and carpentry is what Leafair is built on.

Leafair Construction is run by Ryan McDonald, a licensed California General B contractor working across San Francisco and the Bay Area. You talk to the person who priced the job and the person who's on site — there's no project manager in between.

Every kitchen is quoted as a line-item estimate with written scope for each trade, so you can see what's included, what isn't, and what's deliberately left open until the walls come off. Nothing gets a made-up number just to make the total look finished.

Browse completed kitchens →

What's included

From layout to final finish

Standard scope on a Leafair kitchen remodel. Every line appears separately on your estimate with its own written description.

  • Site protection, dust containment and floor protection before anything comes out
  • Demolition of cabinetry, countertops, flooring, tile, appliances and finishes
  • Hauling and legal disposal of all construction debris
  • Framing changes for new layouts — walls opened, headers set, openings adjusted
  • New plumbing — supply, waste and vent, sink, dishwasher, disposal and pot filler rough-in
  • New electrical — dedicated appliance circuits, GFCI small appliance circuits, under-cabinet, recessed and pendant lighting
  • Range hood ventilation with code-compliant exterior termination, and gas line work as required
  • Insulation, drywall, tape and finish, ready for paint
  • Cabinetry installation — set level, plumb, scribed to the wall and secured to blocking
  • Countertop coordination, templating and installation with tight seams
  • Backsplash tile, flooring, doors, casing, base and trim
  • Prep, prime and paint; appliance installation, daily cleanup and permit coordination
How it's built

Seven stages, with inspection holds built in

The order doesn't change. At the inspection points, the City sets the pace — not the crew.

01

Protect & demolish

Containment goes up first, then cabinetry, counters, flooring and finishes come out.

02

Framing & layout

Walls opened, headers set and openings adjusted to suit the new plan.

03

Rough plumbing, electrical, gas & vent

Every service run to its final location. Rough inspections follow.

04

Insulation & drywall

Insulated, inspected, boarded, taped and finished ready for paint.

05

Cabinetry

Set level and plumb, scribed to the wall, secured to blocking. Then counters are templated.

06

Stone, backsplash & flooring

Countertops installed, backsplash tiled, flooring laid and transitions finished.

07

Paint, appliances & trim-out

Paint, appliance installation, fixture and hardware trim-out, then the punch list.

HOLDS

Inspections

Framing. Rough plumbing, gas and mechanical. Rough electrical. Insulation. Drywall. Final.

Materials

Who supplies what

You buy the finish materials. Leafair supplies the labor and everything that goes behind them.

You supply

Cosmetic and finish material

  • Cabinetry and cabinet hardware
  • Countertops and stone slabs
  • Backsplash and floor tile
  • Appliances, sinks and faucets
  • Light fixtures — pendants, recessed trims and under-cabinet
  • Paint colors, sheens and product selections
Leafair supplies

Installation and all rough material

  • All labor, every trade, start to finish
  • Framing lumber, blocking, backing, shims and fasteners
  • Wire, boxes, devices, pipe, fittings, valves, gas line and duct
  • Insulation, drywall, tape and finish
  • Thinset, grout, caulk, sealant and setting materials
  • Primer and paint, protection, hauling and cleanup
Would rather not source the finish material yourself? Leafair can handle the ordering, tracking and delivery. That service is billed at cost plus overhead and profit, the same as any other line on the estimate — and you see the number in writing before anything is purchased.
What clients say

Trusted by SF homeowners

★★★★★

Exceptional craftsmanship and attention to detail from start to finish. Leafair turned our ideas into exactly what we pictured.

Matt Morgan
★★★★★

Top-tier craftsmanship and personalized service — they delivered exactly what they promised, on time.

Alyssa Cortez
★★★★★

The staining and painting work beautifully brought our wood surfaces back to life. The crew was quick and the whole job was done with zero hassle.

Annie Chocas
Service areas

Kitchen remodeling across San Francisco

Leafair works throughout the city and the surrounding Bay Area. Not listed? Call and ask.

MarinaPacific HeightsNoe ValleyThe Castro SunsetRichmondBernal HeightsPotrero Hill MissionRussian HillDaly CitySan Mateo PacificaSan RafaelBerkeley
Questions

Kitchen remodeling, answered

How much does a kitchen remodel cost in San Francisco?

It depends on whether the layout moves and what you select. Keeping the existing plumbing and electrical where they are is a very different job from relocating a sink, adding an island or opening a wall. Rather than quote a range that means nothing for your kitchen, Leafair walks the space, prices every trade as its own line, and gives you a written estimate you can compare against anyone else's. Estimates are free.

How long does a kitchen remodel take?

A full kitchen renovation generally runs a couple of months from demolition to final clean. The two things that move the date are the City's inspection holds and the lead times on cabinetry, stone and appliances — cabinetry in particular is often ordered many weeks ahead. Getting your selections locked early is the single biggest thing you can do to protect the schedule.

Do I need a permit for a kitchen remodel in San Francisco?

Usually, yes. Moving plumbing or gas, adding circuits, altering framing or changing ventilation all require a permit from the San Francisco Department of Building Inspection, and permitted work is inspected at set stages. Leafair handles the permit process and attends the inspections. Permit fees are paid by the homeowner directly to the City, and the time spent collecting permits and attending inspections is billed hourly rather than marked up.

Can I keep my kitchen usable during the work?

Not the kitchen itself — once demolition starts the room is a construction site until cabinetry and counters are in. What Leafair can do is set up a temporary kitchen elsewhere in the house with a fridge, microwave and a working sink where plumbing allows, and keep the rest of the home sealed off with dust containment so you can live there through the job.

Who supplies the cabinets, stone and appliances?

You do. Cabinetry, countertops, tile, appliances, sinks, faucets, light fixtures and hardware are selected and supplied by the homeowner, so you get exactly what you chose at the price you found it for. Leafair supplies all labor and all rough material, including framing, wiring, pipe, gas line, duct, insulation, drywall, thinset, grout and paint. If you'd rather Leafair handle the ordering, that can be arranged at cost plus overhead and profit.

What happens if you find a problem behind the wall?

You hear about it before anything is repaired. Damaged framing, old knob-and-tube wiring, failed plumbing or a floor that won't take stone only becomes visible once demolition is done. When something turns up you get a written change order with the cost, the reason and the schedule impact, and nothing proceeds on it until you approve. Work continues on everything else in the meantime.

Are you licensed and insured?

Yes. Leafair Construction Inc holds California General B contractor license number 1108517 and carries full insurance. All trade work is performed by licensed and insured subcontractors.

Ready to talk about your kitchen?

Tell Ryan about the project and he'll get back to you to schedule a free estimate or job walk — usually within one business day.

Request a Free Estimate

All Leafair services  ·  Projects  ·  Guides